Goodyear Arizona

Go To Search
Print Page
email page
employee login

Engineering Department

Storm Water Management Documents

The links below are Adobe Portable Document (PDF) files, which require the Adobe Reader to open.

image001.gif

Storm Water Management for Construction Sites

Storm Water Pollution Prevention for Construction Sites provides an overview of Engineering Department requirements for plan submittals and construction site compliance with Storm Water pollution prevention.

 

Small Sites

·          Area of land disturbance is less than 1 acre, and

·          not part of a Larger Common Plan of Development or Sale, and

·          located farther than 1/4 mile from impaired or unique waters

Check List for Best Management Practices (BMP) Plan

 

Large Sites

·          Construction that results in land disturbance of 1 acre or greater, or

·          less than 1 acre if part of a Larger Common Plan of Development or Sale, or

·          project is located within 1/4 mile of impaired or unique waters

Check List for Storm Water Pollution Prevention (SWPP)

 

Other Storm Water Documents

Citys Storm Water General Permit AZG2002-002


Citys Storm Water Management Plan

Report a Storm Water Problem

Storm Water Management Plan Reference Page

 

Other Agencies

EPA SWPPP Template

2008 ADEQ Construction General Permit SWPPP Guidance Checklist

ADEQ AZG2013-001 General Permit for Discharge form Construction Activities

ADEQ AZPDES Storm Water Permits

EPA NPDES Information


EPA NPDES Stormwater pollution Prevention Plan Guidance

Top

Last Updated: 4/15/2014


City of Goodyear Logo
City of Goodyear • 190 N. Litchfield Road • Goodyear AZ 85338 • Phone 623-932-3910 • Toll-Free 1-800-872-1749
Air Quality
RSS Feeds JoinFollowWatch