Regulatory Documents

Goodyear 2035 General Plan

Parks Master Plan

Transportation Master Plan

Integrated Water Master Plan
Integrated Water Master Plan Tables, Appendices & Figures

Integrated Wastewater Master Plan

Integrated Water and Wastewater Build Out Map

 

Zoning Ordinance

Zoning Map

 

City Project Map

Includes Complete Projects, Facility, Street, Parks, Wastewater, Water, Art, and Future CIP Projects

 

Design Guidelines

El Rio Design Guidelines

 

Approved Materials 

The links below are Adobe Portable Document (PDF) files, which require the Adobe Reader to open.

Asphalt Mixes

Approved Asphaltic Concrete Mix Designs 

Allow ten working days for review of mix designs not on the current approved list. 

Landscape

Decomposed Granite

February 2010

Parks and Rights-of-way

March 2020

Trees for Goodyear Public Spaces

February 2010

Sanitary Sewer

Sanitary Sewer Materials List

October 2024

Streets

Sidewalk Ramp Materials List

September 2008

Water

Approved Materials List for Water Distribution

August 2022

Water Production Materials List

November 2017

Reclaimed Water Materials List

May 2013

 Traffic

Traffic Signals, ITS & Lighting December 2025

 

Subdivision Regulations

Chapter 15 of the City Code

 

Engineering Design Standards and Policy Manual

 

Building and Fire Code

2018 IBC & City Amendments

 

Additional Documents

Development Services Fee Schedule

West Goodyear water studies

CIP

City Code

Section 23 Master Study

Traffic Control Moratorium Notice

Solid Waste Design Standards

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer