City of Goodyear
Home MenuConstruction Meters
Temporary Construction Water Meter Request Form
Construction Meters - Potable Water
| Installation Fee: | Non-refundable $150.00 |
| Water Fees: | Monthly base fee is determined by the size of meter (see the meter list below). Fees for water used will be based on the tier system: |
| Tier 1 | 0 - 40,000 gallons | $5.70 per one thousand gallons |
| Tier 2 | 40,001 - 100,000 gallons | $9.12 per one thousand gallons |
| Tier 3 | 100,001 gallons and over | $11.82 per one thousand gallons |
| CAP FEE | $1.55 per one thousand gallons |
Deposit amount and monthly fee depends on the meter size and type (see Meter Size List below).
Reclaimed Meters
| Installation Fee: | Non-refundable $150.00 |
| Water Fees: |
Monthly base fee is determined by the size of meter (see the meter list below) |
Deposit amount depends on the meter size and type (see Meter Size List below).
Meter Size List
| Meter Size | Monthly Fee | Meter Type | Deposit Amount |
| 3" | $87.42 | Turbo | $1,507.31 |
| 4" | $142.55 | Turbo | $3,115.85 |
| 6" | $270.53 | Turbo | $5,274.90 |
| 8" | $270.53 | Turbo | $8,161.29 |
| 3" | $87.42 | Hydrant Meter | $1,507.31 |
